top of page
![](https://static.wixstatic.com/media/08659a_4ddd75630e1944829179d41dab148c5d.jpg/v1/fill/w_1920,h_1266,al_c,q_90,usm_0.66_1.00_0.01,enc_avif,quality_auto/08659a_4ddd75630e1944829179d41dab148c5d.jpg)
Machinery Installation
A world leader in the manufacture of hot water Services, Our customer upgraded to a "state of the art" furnace to enable the busniess to produce a number of different size cylinders at the same time while reducing their power consumtion and increase the line speed.
M & M Autopak was engaged as the principle contractor to support the OEM engineering company from Italy.
This project had 15 mechanical/electrical tradesman working over a period of 16 weeks during 2015
There was large periods of time when tradesman were involved in heavy lifts and working from heights. No accidents where recorded during this installation.
![IMG20230722074915](https://static.wixstatic.com/media/08659a_2a5ec1adf0254156961732268e016635~mv2.jpg/v1/fill/w_980,h_438,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/08659a_2a5ec1adf0254156961732268e016635~mv2.jpg)
IMG20230722074915
![IMG20230722080155](https://static.wixstatic.com/media/08659a_0130ef1439f349368b8b7a8c70bb7c42~mv2.jpg/v1/fill/w_980,h_438,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/08659a_0130ef1439f349368b8b7a8c70bb7c42~mv2.jpg)
IMG20230722080155
![](https://static.wixstatic.com/media/08659a_a84554b2c8d84e3a9094dbb0d0a21a6e.jpg/v1/fill/w_980,h_1307,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/08659a_a84554b2c8d84e3a9094dbb0d0a21a6e.jpg)
![IMG20230722074915](https://static.wixstatic.com/media/08659a_2a5ec1adf0254156961732268e016635~mv2.jpg/v1/fill/w_980,h_438,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/08659a_2a5ec1adf0254156961732268e016635~mv2.jpg)
IMG20230722074915
1/12
bottom of page